Month End Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Good News !!! PDD ARE 5.0 Project Development and Documentation Exam is now Stable and With Pass Result

PDD Practice Exam Questions and Answers

ARE 5.0 Project Development and Documentation Exam

Last Update 1 day ago
Total Questions : 100

Architect Registration Examination is stable now with all latest exam questions are added 1 day ago. Incorporating PDD practice exam questions into your study plan is more than just a preparation strategy.

PDD exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through PDD dumps allows you to practice pacing yourself, ensuring that you can complete all Architect Registration Examination practice test within the allotted time frame.

PDD PDF

$43.75
$124.99

PDD Testing Engine

$50.75
$144.99

PDD PDF + Testing Engine

$63.7
$181.99
Question # 1

Option 1 is the originally designed connection detail for a banner hanging system of steel tube beams and threaded rods in a high atrium space. The threaded rod connections to the structure are fabricated as part of the structure. The remaining members are field fabricated. The weights of beam and banner are identical at each level. Option 2 has been proposed to alleviate constructability issues. The structural ramifications must be evaluated before this change can be approved.

Click on the nut in option 2 that will realize a greater load due to the proposed change.

Options:

Discussion 0
Question # 2

Refer to the exhibit.

What is the primary function of the 2 x 4 blocking shown at X in the drawing?

Options:

A.  

Transfer the lateral loads from the ceiling joists

B.  

Support the top of the partition

C.  

Brace the ceiling joists

D.  

Transfer the lateral load to the 1 x 8

Discussion 0
Question # 3

Refer to the exhibit.

What will the overall coefficient of Heat Transmission (U-value) of the building assembly illustrated in the attached figure become if unfaced R-19 batt insulation is added in the stud spaces in the wall cavity?

Options:

A.  

0.024

B.  

0.043

C.  

0.052

D.  

0.240

Discussion 0
Question # 4

In an air-conditioned space in a tropical environment, roof insulation is being applied above a structural deck. In order to avoid problems related to condensation, where should the vapor barrier be installed?

Options:

A.  

Above the insulation

B.  

Below the insulation

C.  

Below the structural deck

D.  

Below the ceiling

Discussion 0
Question # 5

Refer to the exhibit.

An architect reviews the construction manager's construction estimate for a typical precast wall system with aluminum storefront windows.

Click on the component in the axonometric detail that is missing from the system estimate.

Options:

Discussion 0
Question # 6

Refer to the exhibit.

The exterior cast-in-place concrete wall of a heated building is insulated with polyurethane slabs.

The concrete will be warmest in the winter if the insulation is applied as shown in which of the following?

Options:

A.  

A

B.  

B

C.  

C

D.  

D

Discussion 0
Question # 7

Given the information below, which of the following is the cost of 1,850 sq. ft. of brick veneer?

    Cost of brick – $500 per 1,000 brick

    Cost of masonry cement, sand, etc. – $160 per 1,000 brick

    Cost of labor – $675 per 1,000 brick

    680 bricks per 100 sq. ft.

    5% waste of material

Options:

A.  

$15,520

B.  

$16,794

C.  

$17,634

D.  

$19,732

Discussion 0
Question # 8

What is the most destructive factor affecting the durability of mortar joints?

Options:

A.  

Wind loading

B.  

Location of control joints

C.  

Efflorescence

D.  

Expansion of moisture by freezing

Discussion 0
Question # 9

During plan review of an office building, the reviewer informs the architect of new regulations that require storage rooms greater than 150 sf be 1-hour fire rated. The proposed design has three 200 sf storage rooms that must meet the fire protection requirements. The architect needs to recommend how to meet this requirement with minimal effect on cost, time, and program.

Options:

A.  

Construct storage rooms using rated concrete masonry.

B.  

Construct storage rooms using metal studs and Type X gypsum board.

C.  

Make four 150 sf storage rooms and redistribute throughout the building.

D.  

Make six 100 sf storage rooms and redistribute throughout the building.

Discussion 0
Question # 10

In addition to reducing heat conductance, the thermal break in the construction of metal window frames does which of the following?

Options:

A.  

Increases air infiltration

B.  

Increases sound transmission

C.  

Reduces condensation

D.  

Reduces the cost of manufacture

Discussion 0
Get PDD dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |