PMP Practice Exam Questions and Answers

Project Management Professional (2025 Version)

Last Update 1 day ago
Total Questions : 1877

Project-Management-Professional is stable now with all latest exam questions are added 1 day ago. Incorporating PMP practice exam questions into your study plan is more than just a preparation strategy.

PMP exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through PMP dumps allows you to practice pacing yourself, ensuring that you can complete all Project-Management-Professional practice test within the allotted time frame.

PMP PDF

$159.6
$399

PMP Testing Engine

$179.6
$449

PMP PDF + Testing Engine

$239.6
$599
Question # 1

A project manager was just assigned to a project as the leader of an experienced agile team. How should the project manager influence the team to accomplish the project objectives?

Options:

A.  

Express trust in the team's ability to fulfill the necessary deliverables.

B.  

Assert judgment over the team.

C.  

Use a plan-driven approach in order to demonstrate control over the project.

D.  

Increase the amount of subject matter experts (SMEs) to get better results.

Discussion 0
Question # 2

A project manager is overseeing a project as part of a program geared toward a major technology disruption. The team is comprised of brilliant young professionals who have worked on different projects for the organization in the past. However, the team complained that they previously experienced a lack of direction during project execution and are a traid of the same issue in this project.

Which two actions should the project manager take to ensure that this issue does not occur in this project? (Choose two)

Options:

A.  

Keep the team engaged and focused on the project's direction.

B.  

Encourage the team to do a brainstorming session and provide a mitigation plan.

C.  

Focus on the resource management plan and track project progress,

D.  

Set a clear vision for the project and ensure it is visible to all stakeholders.

E.  

Organize a team-bonding activity and invite an external manager to speak to the team.

Discussion 0
Question # 3

A labor union contract negotiation is delaying the completion of a project to build

a new manufacturing plant. Because the labor contract was due for renewal this year, the

project manager documented the negotiation process as a risk to the project. The project

was about to start the first phase of equipment installation at the plant when the negotiation began.

How should the project manager address the situation?

Options:

A.  

Meet with the project team to determine options for risk mitigation.

B.  

Log the issue and follow the planned actions in the risk response plan.

C.  

Acquire contract resources and submit a change request for the cost impact.

D.  

Escalate the issue to the steering committee to ask for mitigation support.

Discussion 0
Question # 4

A global company hired a project manager for a new implementation at all of its sites After reviewing the business case and project charter, the project manager notes that the project team has different locations and regions to consider.

What should the project manager do to address this situation?

Options:

A.  

Inform the steering committee of the situation and request additional resources.

B.  

Coordinate virtual and face-to-face meetings at each site to improve communication

C.  

Coordinate virtual meetings to assess the project team's communication needs

D.  

Inform the project sponsor of this situation and request cultural orientation training.

Discussion 0
Question # 5

During a sprint planning meeting, a stakeholder is told that their requirement is in progress and on track for the final product to be ready in the next two sprints. The stakeholder is very satisfied with the timeline and gives their full support to the agile team. After the meeting, the project sponsor calls the project manager about a large requirement they want the team to work on right away as it has significant

business value. What should the project manager do?

Options:

A.  

Call the stakeholder to tell them that the final product schedule must be extended due to this last minute, urgent request.

B.  

Perform an impact analysis and share the overall schedule impact before deciding on a new priority.

C.  

Reject the new requirement from the sponsor as this is going to impact the delivery of the stakeholder's final product.

D.  

Ask the product owner to prioritize the new request from the sponsor and ask the team to work on it immediately.

Discussion 0
Question # 6

In an agile product development environment, work is distributed to Cities A, B, and

C, which are geographically dispersed. The small teams work and collaborate to deliver the

sprints.

• City A's team focuses on the features of data capture.

• City B's team focuses on the user experience and development pieces.

• City C's team coordinates testing.

What should the project manager do to ensure a successful rollout of sprints?

Options:

A.  

Ensure all three teams deliver independently without interactions so that they remain

focused and meet customer requirements.

B.  

Implement communication techniques and ensure the teams follow a relay pattern of

handing off work from one team to the other.

C.  

Use a fishbone analysis to resolve problems and iron out communication issues

between the teams.

D.  

Maintain localized teams to circumvent the challenges of delay or any other

unforeseen risks that might prevent progress.

Discussion 0
Question # 7

A hybrid project is experiencing several issues with both the agile delivery of the

product as well as the predictive development of a marketing strategy. What should the project manager do to receive feedback from stakeholders located in different time zones?

Options:

A.  

Refer to the stakeholder engagement plan.

B.  

Set up a conference call for all stakeholders.

C.  

Refer to the communications management plan.

D.  

Send an email to all stakeholders.

Discussion 0
Question # 8

A project manager is managing a hybrid project A stakeholder has directly contacted a team member and has requested a change Due to the request, the team member was distracted from their work, which caused a loss in productivity.

What should the team member do?

Options:

A.  

Inform the stakeholder that the correct procedure for new requirements is to provide it directly to the project manager.

B.  

Inform the scrum master regarding the stakeholder's request for a change and the impact this has had on productivity.

C.  

Inform the stakeholder that the correct procedure for new requirements is to provide it directly to the change control board (CCB).

D.  

Inform the scrum master so that the change can be discussed directly with the stakeholder.

Discussion 0
Question # 9

A project manager is assigned to a new project to deliver a product at the end of the year. The project manager was informed by the vendor that a core component could not be shipped on time, which will impact the schedule.

What should project manager to do next to minimize the impact on the project?

Options:

A.  

Schedule a meeting with all stakeholders to extend the project deadline

B.  

Replace the vendor with a new vendor who can offer the component on time

C.  

Add an item to the next status review to make stakeholders aware of the vendor issue.

D.  

Review and update the issue log and determine if any alternative components can be offered

Discussion 0
Question # 10

The team has reported the following impediments at the daily standup meeting Drag each impediment on the left to the action that the project manager needs to take on the right

Options:

Discussion 0
Question # 11

A newly hired team member just joined the project team and reports directly to the

project manager. In the first week, this new member tells the project manager that there is a

task priority conflict with hard, dependent tasks on the critical path.

What should the project manager do to handle the conflict?

Options:

A.  

Guide the team member on how to resolve the conflict.

B.  

Analyze the project schedule and look for alternatives.

C.  

Perform crashing and/or fast tracking of the schedule.

D.  

Meet the team member and try to plan a course of action together.

Discussion 0
Question # 12

In an iteration-based marketing project, a product is scheduled to be launched at the sixth iteration In the third iteration demo the marketing team expressed that they need five iterations to launch the product and they have not started yet

What should the project team have done to avoid this issue?

Options:

A.  

Held a touchpoint with marketing before the demo to discuss any impediments

B.  

Scheduled a demo presentation of the product during the first reason

C.  

Asked the marketing team to start working on the product immediately

D.  

Confirmed marketing requirements and constraints when adding to the backlog

Discussion 0
Question # 13

A project manager has been assigned to a project that is in progress. The project

manager is looking for information regarding why the project is being completed.

What should the project manager do first?

Options:

A.  

Evaluate the project exit criteria in the project charter.

B.  

Reach out to the senior executive sponsor for the project.

C.  

Understand the project success criteria and objectives.

D.  

Review the project status reporting for the latest information.

Discussion 0
Question # 14

The portfolio management office wants to cut costs by suspending some ongoing

projects that do not directly support the organizational strategy. The project manager has invested too many resources into one of the projects to be suspended, but the portfolio

management office has not backed down on their plan.

What should the project manager do to continue the project?

Options:

A.  

Meet with the project team and revise the project goals.

B.  

Update the project charter to make it align with organizational strategy.

C.  

Demonstrate the project alignment to the organizational strategy.

D.  

Escalate the issue with the project sponsor to request support.

Discussion 0
Question # 15

For an ongoing project, match the key performance indicators (KPIs) on the left to the correct categories on the right.

Options:

Discussion 0
Question # 16

A business stakeholder for a project is reluctant to accept an agile approach due to a previous bad experience, and is pushing for a predictive approach. What strategy should the project manager use to persuade the stakeholder to use an agile approach?

Options:

A.  

Propose a phased project approach with multiple small interactions and build trust with the stakeholder through frequent value delivery.

B.  

Document the request and escalate to upper management to consider a modification of the project charter.

C.  

Agree on a predictive approach, but apply agile concepts under the project management umbrella.

D.  

Ensure the stakeholder that an agile approach will deliver all of the expected results in a shorter period of time.

Discussion 0
Question # 17

In the middle of a project, a business unit manager who regularly interacts with the project manager's team is promoted to a higher management position. The replacement manager is from the same unit and is somewhat familiar with the project.

After getting more information about the new manager, what is the project manager's next step?

Options:

A.  

Contact the previous business unit manager to learn more about the new manager.

B.  

Update the stakeholder register and the stakeholder engagement plan to include the new manager.

C.  

Send the new manager a copy of the project charter to ensure the project objectives are understood.

D.  

Schedule a meeting with the new manager to discuss the business analysis team's plans.

Discussion 0
Question # 18

A project manager is assigned to an organizational transformation project. The company typically defines individual performance plans at the beginning of the year, and functional managers conduct feedback reviews at the end of the year. The transformation project team members are concerned that the work they are doing for this project is not aligned with the work included in their individual performance plan for the year.

What should the project manager do?

Options:

A.  

Meet with the functional managers to align the expected frequency and results reporting for the team members.

B.  

Provide performance feedback to the learn members' functional managers at the end of the year.

C.  

Assure team members that this project is a high priority for the company and they will be evaluated accordingly.

D.  

Request to be made responsible for the performance plans of those on this project team

Discussion 0
Question # 19

A project manager has just taken over a project that is in the requirements gathering phase. A stakeholder indicates that they have not received any progress updates even

though reports have been sent on a weekly basis.

What should the project manager do to ensure all stakeholders are receiving proper information about the project?

Options:

A.  

Hold a steering committee meeting with all stakeholders to provide a comprehensive update on the project progress.

B.  

Create daily progress reports and send them to all stakeholders.

C.  

Include stakeholders in the weekly status meetings with the team.

D.  

Assess all of the project stakeholders and document their preferred communication method and frequency.

Discussion 0
Question # 20

A new development project is about to start, and the project manager knows that a high-profile customer makes very specific and frequent requests in all sprints. This project will demand contract coordination with third parties, and the project manager must find a better way to manage customer and partner expectations.

What strategy should the project manager use?

Options:

A.  

Focus on the implementation of a software as a service (SaaS) solution for the customer.

B.  

Specify the scope and features to be deployed in the contract clearly.

C.  

Work very closely with the customer and third parties to meet their needs.

D.  

Change the marketing and product management definitions to meet stakeholder needs.

Discussion 0
Question # 21

During the third iteration of a project, the product owner requests another mandatory feature. This also happened in the previous two sprints, which resulted in failure and caused frustration within the team.

What should the project manager do next?

Options:

A.  

Incorporate the changes in the last sprint before the first release.

B.  

Call for an internal meeting to discuss the changes and their value.

C.  

Ask the product owner to prioritize the backlog with the project team.

D.  

Request the scrum team to prioritize the product backlog.

Discussion 0
Question # 22

A scrum team's daily meetings are conducted by teleconference between three teams, each located in different countries. The meetings typically

last 45 minutes with many misunderstandings due to language barriers.

How should the project manager resolve this issue for the next iteration?

Options:

A.  

Transfer half of the backlog items to the next iteration to allow more time to complete the meetings.

B.  

Extend the meeting to 1 hour and request that all of the participants bring up all of the issues.

C.  

Instruct the meeting participants to speak only about blockers during the meeting.

D.  

Train the three team leads to conduct a local meeting, then run an overall status meeting.

Discussion 0
Question # 23

A project manager is managing an internal project with a tight budget and schedule. While executing the project, the project manager realizes that

some stakeholders are working against the success targets of the project.

What should the project manager do to ensure successful project delivery? (Choose two)

Options:

A.  

Update the project stakeholder analysis and methods to satisfy the stakeholders’ requirements.

B.  

Escalate the issue to the functional manager and ask for support.

C.  

Involve all stakeholders in the project by distributing status reports.

D.  

Focus on the supportive stakeholders and minimize involvement of unsupportive stakeholders.

E.  

Engage all stakeholders in the project including the unsupportive stakeholders.

Discussion 0
Question # 24

A project manager is assigned to a large construction project with more than 100 project team members. The project manager is having a hard time keeping the project on track and deriving the planned benefits. The project manager wants to make sure that each requirement is linked to the business and project objective.

What should the project manager do?

Options:

A.  

Review the requirements on a weekly basis.

B.  

Implement a requirements traceability matrix.

C.  

Add the requirements to the project charter.

D.  

Understand the project management plan.

Discussion 0
Question # 25

A project manager is assigned to a project team midway through execution. Several dependencies are impacting the project, and the project manager feels the team is not adequately informed of the impacting changes.

What should the project manager do first?

Options:

A.  

Convene an impact analysis meeting.

B.  

Escalate the issue to the product owner.

C.  

Consult the communications management plan.

D.  

Review the stakeholder register.

Discussion 0
Question # 26

A project manager is working on an agile project. The organization decided to implement the Scrum framework. The project manager organized a workshop to explain the differences between traditional project artifacts and the Scrum approach. The most frequent question raised is what artifact will replace the project schedule.

What should be me project manager's response?

Options:

A.  

Sprint plan and product roadmap

B.  

Product roadmap and sprint backlog

C.  

Product backlog and scrum board

D.  

Sprint backlog and scrum board

Discussion 0
Question # 27

While managing a project using a hybrid approach, the project manager realizes that there is a high level of rework due to quality issues. Because

of that, each feature is taking longer than initially estimated.

What should the project manager do to address the issue?

Options:

A.  

Escalate the issue to the project sponsor.

B.  

Address the issue during the next sprint planning meeting.

C.  

Initiate a change request to extend the project end date.

D.  

Extend the dates for future project milestones.

Discussion 0
Question # 28

A project team member informs the project manager that a stakeholder is contacting the team member to request status updates. The team member is being distracted by these repeated requests, which are interfering with the completion of assigned tasks.

What should the project manager do?

Options:

A.  

Increase the frequency of updates given to this stakeholder.

B.  

Inform the team member to stop sending any further updates to the stakeholder.

C.  

Raise this issue to the project sponsor in the next project status review meeting.

D.  

Review this stakeholder's communication requirements.

Discussion 0
Question # 29

A project is designed to provide local community members with health facilities that will support improved sanitation practices. What should the project manager do to

ensure the community members are up to date on project progress?

Options:

A.  

Share project updates when requested by the stakeholders.

B.  

Share project updates through regular community meetings.

C.  

Share the annual reports virtually and in the local newspapers.

D.  

Share the project reports with the sponsor to inform community members.

Discussion 0
Question # 30

A project manager is assigned to a new project team that has several stakeholders who can have significant influence over the project outcomes.

The project manager categorized the stakeholders into four different groups and wants to define the communication strategy.

How should the project manager handle communication?

Options:

A.  

Utilize a uniform communication structure across all groups.

B.  

Define and direct communication to influential stakeholders.

C.  

Describe the four groups in the project stakeholder matrix.

D.  

Develop and define a communication strategy for stakeholders.

Discussion 0
Question # 31

Halfway through a project, the project sponsor is replaced by another peer who was not previously engaged in the project. The new project sponsor has rejected most of the project artifacts, and the team did not get the latest increment approved on the current iteration. Stakeholders are not feeling confident about the project outcome.

What should the project manager have done to prevent this situation?

Options:

A.  

Performed a stakeholder analysis when the sponsor joined the project

B.  

Held a governance meeting to review the project increment

C.  

Conducted a product iteration review with the new project sponsor

D.  

Escalated the issue to ensure the increment would be approved

Discussion 0
Question # 32

During the development of a project in a dynamic market environment, new unforeseen legal requirements have come into effect. The project

manager is not sure if some of the project deliverables will be fully compliant with the new requirements.

What should the project manager do?

Options:

A.  

Stop the project until someone in the organization can identify all the new requirements and how they impact the project.

B.  

Request the project management office (PMO) to assign a dedicated resource to monitor the external environment to enable more reaction

time.

C.  

Agree with the project team that the new requirements will be applied to the next project, not the one already under development.

D.  

Evaluate the consequences of noncompliance with relevant stakeholders and update the risk register with agreed actions.

Discussion 0
Question # 33

A project manager has recently taken over a project and notices that a client team member often halts progress due to a lack of understanding of some project elements.

The former project manager gave the new project manager a complete list of people to communicate with, and this client team member is not on it.

What should the project manager do?

Options:

A.  

Update the communications matrix to ensure that client team member is included.

B.  

Submit a change request to cover extra hours associated with project meetings.

C.  

Increase the project meeting frequency and duration to allow for the extra work required.

D.  

Speak with the client team member about the continuous delays during project meetings.

Discussion 0
Question # 34

A project manager works in an organization that embraces using different project approaches. The project manager's current project uses a

predictive approach with clear requirements. A few months following the kickoff, the project manager notices that the virtual development teams

are not communicating enough, and coordination is becoming an issue. The teams are not aligned on the tasks being done or the current

impediments.

What should the project manager do?

Options:

A.  

Ask the members to be more proactive and share ideas with each other.

B.  

Set up a daily virtual meeting with the development team.

C.  

Plan a monthly virtual meeting to align and to review the plans.

D.  

Review the issue with the project sponsor and ask for support.

Discussion 0
Question # 35

A project manager who is experienced in predictive and adaptive approaches has been assigned to a new project. Most of the project

stakeholders have only worked on predictive projects, and only a few have been exposed to adaptive projects.

What should the project manager do?

Options:

A.  

Propose a hybrid approach and determine which stakeholders will be engaged in each phase of the project.

B.  

Follow a predictive approach to reduce the training effort, even though there are incremental deliveries in the project.

C.  

Use an adaptive approach, engage the stakeholders who have been exposed to adaptive projects, and train those who have not.

D.  

Understand the scope complexity and project magnitude prior to determining which approach to use.

Discussion 0
Question # 36

A project manager just finished a meeting to identify the main stakeholders of the project. What should the project manager do next?

Options:

A.  

Monitor all stakeholders.

B.  

Keep all stakeholders informed.

C.  

Analyze the stakeholders.

D.  

Engage the stakeholders.

Discussion 0
Question # 37

A project manager is working on a time and materials (T&M) project using a hybrid approach. The milestones and outcomes are defined for the first 6 months with

incremental releases every month. After the first 2 months, the client communicates their dissatisfaction with the results and asks to change the course of the project. The project manager held a face-to-face meeting with the client and now has a better understanding of the newly desired milestones and outcomes.

What should the project manager do first?

Options:

A.  

Forward the client's request to management as a change request to get formal approval.

B.  

Document the information in the meeting minutes and share it with the project stakeholders.

C.  

Draft a contract change with the desired scope changes and send it to the client for approval.

D.  

Finish the current monthly release as it was planned and replan for the future months.

Discussion 0
Question # 38

A hybrid project has just started, which will result in a new technology that could disrupt the market if well accepted by the public. The product requires health and safety

approvals from the government. As this is an innovative solution, the sponsor and product owner are unsure if it will be accepted by the public.

What is the appropriate flow for product development?

Options:

A.  

Complete development with all functionalities in perfect condition prior to demonstrating to stakeholders to ensure a great first impression.

B.  

Complete development for each sprint and demonstrate the product increment to internal stakeholders and the government, without engaging other external

stakeholders.

C.  

Complete development for the must-have functionalities only prior to demonstration in order to fail fast and get early feedback.

D.  

Complete development for must-have functionalities only and demonstrate it to a focus group, but wait until all development is complete to demonstrate it to the

government.

Discussion 0
Question # 39

During project execution, one of the project tasks is to create an important document for a service vendor. The project manager assigns a senior engineer to clearly detail

the service instructions to avoid any redo loops. Two days after the service information document was sent, the service vendor has doubts and needs more clarity on the task. This redo loop will probably cause a delay of one or more days.

What should the project manager do next?

Options:

A.  

Escalate the issue to the engineer's functional manager.

B.  

Discuss the issue with the engineer and determine how to prevent another problem.

C.  

Document the task on the kanban board and make it the highest priority.

D.  

Assign another engineer to the task due to the urgency.

Discussion 0
Question # 40

An agile team is facing a challenge with the quality of its deliverables. Every time a feature is promoted to production, many defects arise, preventing the customers from properly using the solution.

What should the project manager do to avoid this situation in the future?

Options:

A.  

Create a team incentive program with prizes, allowing the team members to work overtime to find defects.

B.  

Reduce the release cycle and invest more time on stabilizing the current features instead of releasing new ones.

C.  

Hire a quality assurance specialist and integrate a second phase of testing into the current project life cycle.

D.  

Use the next retrospective to understand the root cause of the quality issues and have the team come up with an action plan.

Discussion 0
Question # 41

A project manager is working on a software development project. The project manager and the project team identified the project risks. As the

project progressed, one of the risks materialized, and the project manager referred to the risk management plan to determine how to manage the risk. Once the risk management strategy was chosen and implemented, the risk was closed.

At what point did the project manager move the risk from the risk register to the issue log?

Options:

A.  

Risk monitored

B.  

Risk occurred

C.  

Risk managed

D.  

Risk identified

Discussion 0
Question # 42

A project manager has been assigned as the servant leader for an ongoing project that historically has presented unexpected problems. The main stakeholder is hesitant to continue with the rest of the sprints even though there are no open issues or indications of risks at this stage.

What should the project manager do to address this problem?

Options:

A.  

Increase the contingency reserves to cover unknown-unknowns.

B.  

Implement short cycles for inspection and provide feedback.

C.  

Increase the management reserves to convert the known-unknowns.

D.  

Create a new risk entry to identify the stakeholder as a detractor.

Discussion 0
Question # 43

One of the team members is always late to the daily standup meeting. What should the project manager do?

Options:

A.  

Schedule the meeting at the end of the day to accommodate everyone.

B.  

Ignore the situation since the team member is accomplishing their deliverables.

C.  

Reinforce the ground rules for standup meetings with the entire team.

D.  

Speak with the team member directly to reinforce the ground rules.

Discussion 0
Question # 44

A key team member informs the project manager that they have been accepted to a master’s degree program. The team member explains that the first semester of the master's program will coincide with the last phase of the project.

What should the project manager do?

Options:

A.  

Ask the team member to delegate some of their tasks to another colleague during the last phase of the project.

B.  

Suggest the team member postpone their enrollment in the master's program until the project is completed.

C.  

Ask the team member to inform human resources (HR) about their enrollment in the master's program.

D.  

Assess the team member's commitment to the master's program and its impact on project performance.

Discussion 0
Question # 45

At the end of a workshop to review project deliverables, a number of follow-up action items were generated. What should the project manager do next?

Options:

A.  

Defer all actions until the next workshop to keep the team focused on other higher priorities

B.  

Follow up on each item as soon as possible to ensure timely completion and report the status to management.

C.  

Review the critical path and update the project schedule with the newly identified tasks.

D.  

Prioritize the actions with the team, assign individuals who will be responsible for completion, and monitor progress.

Discussion 0
Question # 46

A project team member raised a risk that the threat of country-wide power cuts may affect the project time line for a software development project. In the last month, this risk

materialized and the project time line had to be extended by 2 months.

Which two actions should the project manager take? (Choose two)

Options:

A.  

Ask the team member to work overtime to make up the time lost so that the project schedule is not impacted.

B.  

Analyze the impact of the issue and submit a change request to update the project schedule.

C.  

Inform the project sponsor that the risk has materialized and request that the project budget be increased.

D.  

Extend the project deadline and update the project schedule to reflect the delay.

E.  

Log it in the risk register and work with the relevant owner to implement the mitigation action plan.

Discussion 0
Question # 47

The project manager is reviewing a project's progress and notices that one of the risks has become an issue. What should the project manager do to address the situation?

Options:

A.  

Schedule a high-priority meeting with the project stakeholders to discuss the issue.

B.  

Initiate a change request to obtain additional funds from the management reserve.

C.  

Meet with the project team and customer to brainstorm about potential solutions.

D.  

Collaborate with the relevant stakeholders on implementing the risk response plan.

Discussion 0
Question # 48

A project manager is managing a project aimed at providing incremental deliveries to the market every three months. The team has been assigned, and the product backlog was created and prioritized by the product owner. After four iterations, the product owner escalates complaints to the CEO because the product does not meet the product owner's expectations.

What should the project manager have done to prevent this situation from happening?

Options:

A.  

Implemented sprint reviews with the product owner and retrospectives with the team to minimize gaps

B.  

Performed risk management analysis during daily scrums

C.  

Reviewed the organizational process assets (OPAs) and lessons learned from similar projects

D.  

Performed backlog grooming to ensure that acceptance criteria were being met

Discussion 0
Question # 49

A senior management team member contacts an agile project lead and mentions

that certain features the senior manager thought would be in the current release were not

included. What should the agile project lead do?

Options:

A.  

Assure the senior manager that these features will be queued up in the next sprint.

B.  

Meet with the team to understand why the senior manager’s features were not included.

C.  

Invite the senior manager to the next planning meeting.

D.  

Send the product roadmap to the senior manager.

Discussion 0
Question # 50

A company is conducting a digital transformation project that has a hard deadline.

The marketing team wants to combine this implementation with a new product, and the newly

assigned project manager is not aware of all the dependencies.

Using a hybrid approach, what should the project manager do to ensure the dependencies are

taken into consideration?

Options:

A.  

Implement a project newsletter so the different team members can be informed about

the progress of each project.

B.  

Combine all of the small projects into one big project so the team can collaborate

better as one big team.

C.  

Facilitate communication promoting a Scrum of Scrums so the different teams are

aware of the dependencies and progress.

D.  

Make sure that each individual project schedule is aligned with the common deadlines.

Discussion 0
Get PMP dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |