Cyber Monday Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

CPIM-ECO Execution and Control of Operations is now Stable and With Pass Result | Test Your Knowledge for Free

CPIM-ECO Practice Questions

Execution and Control of Operations

Last Update 1 day ago
Total Questions : 105

Dive into our fully updated and stable CPIM-ECO practice test platform, featuring all the latest CPIM exam questions added this week. Our preparation tool is more than just a APICS study aid; it's a strategic advantage.

Our CPIM practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CPIM-ECO. Use this test to pinpoint which areas you need to focus your study on.

CPIM-ECO PDF

$43.75
$124.99

CPIM-ECO Testing Engine

$50.75
$144.99

CPIM-ECO PDF + Testing Engine

$63.7
$181.99
Question # 1

Which of the following steps should be first in determining operation start dates for capacity planning?

Options:

A.  

Input/output control

B.  

Forward or backward scheduling

C.  

Finite or infinite loading

D.  

Order preparation and release

Discussion 0
Question # 2

Which of the following outcomes is typical of employee engagement?

Options:

A.  

Discretionary effort exerted towards improvement in quality

B.  

Increase debate about company goals

C.  

Decrease in hoshin planning activities

D.  

Increase in kanban size of in-process inventories

Discussion 0
Question # 3

Mixed-model scheduling results in which of the following benefits:

Options:

A.  

Improved efficiency

B.  

Less headcount required

C.  

Lower finished goods inventory

D.  

Increased forecast accuracy

Discussion 0
Question # 4

Which of the following applications is an effective use of electronic data interchange?

Options:

A.  

Routing

B.  

Price increase

C.  

Advance shipment notice

D.  

Returned material authorization

Discussion 0
Question # 5

A production manager uses a hoshin plan to communicate:

Options:

A.  

financial status.

B.  

operational issues.

C.  

new ideas.

D.  

strategy.

Discussion 0
Question # 6

Which of the following benefits is a result of Standardized Work?

Options:

A.  

Ergonomic repetitive movements

B.  

Reduced quality checks

C.  

Evolutionary operations

D.  

Process stability

Discussion 0
Question # 7

In process improvement, which of the following procedures should be done first?

Options:

A.  

Assess employee productivity.

B.  

Analyze process variances.

C.  

Identify process steps.

D.  

Establish priorities for process change.

Discussion 0
Question # 8

A kanban shop floor control system has which of the following characteristics?

Options:

A.  

Large lot sizes

B.  

Fixed routings

C.  

Fixed worker assignments

D.  

Forward scheduling

Discussion 0
Question # 9

In an attempt to reduce costs associated with information system transactions, which of the following approaches should be considered?

Options:

A.  

Discontinue backflushing components

B.  

Reducing levels in the bill of material

C.  

Remove the component supermarket

D.  

Reducing lot sizes of manufactured products

Discussion 0
Question # 10

A work center has one machine that is operated for one shift per day. The shop runs an 8-hour shift 5 days per week. Machine utilization has been 60% with efficiency at 80%. A routing through this work center has a standard run time of .10 hours per piece. Job number 1234 is for 200 pieces. If the utilization is improved to 80%, the difference in calculated lead time for the job is how many days?

Options:

A.  

1.0

B.  

1.3

C.  

2.1

D.  

2.7

Discussion 0
Get CPIM-ECO dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |