Weekend Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

Good News !!! LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) is now Stable and With Pass Result

LEED-AP-O+M Practice Exam Questions and Answers

LEED AP Operations + Maintenance (LEED AP O+M)

Last Update 2 days ago
Total Questions : 100

LEED AP Operations + Maintenance (LEED AP O+M) is stable now with all latest exam questions are added 2 days ago. Incorporating LEED-AP-O+M practice exam questions into your study plan is more than just a preparation strategy.

By familiarizing yourself with the LEED AP Operations + Maintenance (LEED AP O+M) exam format, identifying knowledge gaps, applying theoretical knowledge in USGBC practical scenarios, you are setting yourself up for success. LEED-AP-O+M exam dumps provide a realistic preview, helping you to adapt your preparation strategy accordingly.

LEED-AP-O+M exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through LEED-AP-O+M dumps allows you to practice pacing yourself, ensuring that you can complete all LEED AP Operations + Maintenance (LEED AP O+M) exam questions within the allotted time frame without sacrificing accuracy.

LEED-AP-O+M PDF

$48
$119.99

LEED-AP-O+M Testing Engine

$56
$139.99

LEED-AP-O+M PDF + Testing Engine

$70.8
$176.99
Question # 1

Which of the following best meets requirements of Sustainable Sites Credit, Site Development - Protect or Restore Habitat?

Options:

A.  

Leaving 50% of the site undisturbed

B.  

Using native or adaptive vegetation on 20% of the site area

C.  

Protecting the habitat of an offsite area of land equal in size to the building site area

D.  

Building a rainwater detention pond and using the water for irrigation

Discussion 0
Question # 2

What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.

Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.  

40%

B.  

50%

C.  

60%

D.  

70%

Discussion 0
Question # 3

Innovation credits for exemplary performance are awarded for

Options:

A.  

reaching 100% threshold

B.  

demonstrating significant environmental benefits

C.  

achieving the next incremental threshold

D.  

demonstrating a quantitative improvement in environmental performance

Discussion 0
Question # 4

Storage locations are required for which of the following recyclable materials?

Options:

A.  

Mixed paper, paint, glass, plastics and electronics

B.  

Mixed paper, corrugated cardboard, wood pallets, plastics and metals

C.  

Mixed paper, batteries, glass, plastics and electronics

D.  

Mixed paper, corrugated cardboard, glass, plastics and metals

Discussion 0
Question # 5

Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

Options:

A.  

A product labeled Sustainable Sourced

B.  

An organic product produced within a 500 mi. (805 km) radius

C.  

A United States Department of Agriculture (USDA) organic food product

D.  

A Protected Harvest certified product purchased outside the performance period

Discussion 0
Question # 6

The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,

Light Pollution Reduction. Which interpretations must be used when attempting this credit?

Options:

A.  

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project's registration date that the project thinks is relevant

B.  

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project's

registration date that the project thinks is relevant

C.  

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project's

registration date that applies to the project's rating system

D.  

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the

project's registration date that applies to the project's rating system

Discussion 0
Question # 7

Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards

compliance for what category of building space?

Options:

A.  

Exterior

B.  

Lavatory

C.  

Mechanical

D.  

Individual occupant

Discussion 0
Question # 8

What requirement must be met when creating a demand response program that satisfies Energy and

Atmosphere Credit, Demand Response?

Options:

A.  

Demonstrate a load shift reduction of 5% in the building

B.  

Permanently reduce the energy consumption in the building by 5%

C.  

Have the building management sign a two-year demand response enrollment

D.  

Create a comprehensive plan for meeting the contractual commitment during a demand response event

Discussion 0
Question # 9

A standard reference when creating an indoor air quality management program is

Options:

A.  

Home Energy Rating System (HERS)

B.  

American Society of Heating, Refrigerating and Air - Conditioning Engineers 90.1 - 2010 (ASHRAE)

C.  

Chartered Institution of Building Services Engineers (CIBSE)

D.  

Indoor Air Quality Building Education and Assessment Model (I-BEAM)

Discussion 0
Question # 10

Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon

Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

Options:

A.  

Install an on-site photovoltaic array

B.  

Purchase Green-e certified carbon offsets

C.  

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.  

Install an on-site geothermal energy with a ground-source heat pump

Discussion 0
Question # 11

What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

Options:

A.  

Reduce lawn areas

B.  

Increase habitat diversity

C.  

Increase green space for occupants

D.  

Improve water quality of runoff from rainwater

Discussion 0
Question # 12

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

Options:

A.  

Implement an alternative transportation program and conduct a transportation survey

B.  

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.  

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.  

Implement an alternative transportation program and estimate the alternative transportation rate

Discussion 0
Question # 13

A LEED AP performs several on-site reviews for LEED compliance and encounters the following scenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

Options:

A.  

A school whose electricity usage is being measured and invoiced by the local electrical utility

B.  

A building plus its addition whose electricity and natural gas usage is being measured by the original building's meters

C.  

A data center that receives electricity from a campus plant and whose meters are located at the electrical service entrances

D.  

A building that shares its chilled water usage with other buildings on a campus and whose chilled water consumption is measured at the campus level

Discussion 0
Question # 14

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit,Site Improvement

Plan?

Options:

A.  

Soils

B.  

Hydrology

C.  

Vegetation

D.  

Maintenance equipment

Discussion 0
Question # 15

Which of the following is a feature of the ENERGY STARĀ® Portfolio Manager?

Options:

A.  

Requires input of 36 months of data

B.  

Requires ISO 14001 compliance

C.  

Requires calculation and input of site energy usage

D.  

Requires California Title 24 compliance

Discussion 0
Question # 16

An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?

Options:

A.  

120 days

B.  

495 days

C.  

Two years

D.  

Three years

Discussion 0
Question # 17

Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

Options:

A.  

People visiting patients

B.  

Hospital employees

C.  

Patients being released

D.  

Pharmaceutical representatives

Discussion 0
Question # 18

A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?

Options:

A.  

GreenPro, Ecowise, Greenshield

B.  

Quality Pro, Ecowise, Greenshield

C.  

San Francisco Tier 3, CRI, Green Seal

D.  

Green Seal, San Francisco Tier 3, QualityPro

Discussion 0
Question # 19

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

Options:

A.  

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.  

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.  

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.  

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Discussion 0
Question # 20

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

Options:

A.  

Install a vegetated roof system

B.  

Convert lawn areas to native plants

C.  

Mitigate the vegetated area off-site through a land trust

D.  

Convert the paved areas of the site to pervious pavement

Discussion 0
Question # 21

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

Options:

A.  

LEED Interior Design and Construction

B.  

LEED Building Design and Construction

C.  

LEED for Homes

D.  

No rating system

Discussion 0
Question # 22

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

Options:

A.  

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.  

12 months from the date that GBCI initially certified the building

C.  

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Discussion 0
Question # 23

A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?

Options:

A.  

Heat exchangers

B.  

Central plant chillers

C.  

Primary chilled water pump

D.  

Central plant cooling tower

Discussion 0
Question # 24

What credit rewards customers who change their normal consumption patterns in response to the varying price of

energy over time?

Options:

A.  

Energy and Atmosphere Credit, Demand Response

B.  

Energy and Atmosphere Credit, Ongoing Commissioning

C.  

Energy and Atmosphere Credit, Advanced Energy Metering

D.  

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Discussion 0
Question # 25

In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)

as determined by ASHRAE 52.2-2007 required for renovation activities?

Options:

A.  

7

B.  

8

C.  

12

D.  

13

Discussion 0
Question # 26

Which product recycling requirement applies specifically to LEED APĀ® Operations and Maintenance Schools and Hospitality?

Options:

A.  

Food

B.  

Batteries and lamps

C.  

Electric powered equipment

D.  

Office equipment, appliances and audiovisual equipment

Discussion 0
Question # 27

At what point is it appropriate for the LEED AP to administer an alternative transportation survey to those that visit the building?

Options:

A.  

When 50% of visitors utilize alternative transportation modes to visit the building

B.  

When 80% of visitors utilize alternative transportation modes to visit the building

C.  

When the daily average or typical peak number of visitors is at least 50% of the regular building occupants

D.  

When the daily average or typical peak number of visitors is greater than the number of regular building

occupants

Discussion 0
Question # 28

In the calculations for Water Efficiency Prerequisite, Indoor Water Use Reduction, private use refers to lavatory faucets used by which of the following types of occupants?

Options:

A.  

Prisoners, hospital inpatients, hotel staff

B.  

Apartment residents, motel guests, nursing home residents

C.  

Students, hospital staff, hotel guests

D.  

Dorm residents, fire-station staff, nursing home staff

Discussion 0
Question # 29

Rainwater harvesting can be used for which of the following credits or prerequisites?

Options:

A.  

Water Efficiency Credit, Water Metering

B.  

Water Efficiency Credit, Indoor Water Use Reduction

C.  

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.  

Water Efficiency Prerequisite, Building-Level Water Metering

Discussion 0
Question # 30

Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.  

Air temperature and humidity

B.  

Air speed and radiant temperature

C.  

Air temperature and energy consumption

D.  

Radiant temperature and energy consumption

Discussion 0
Get LEED-AP-O+M dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |